Back to archive
Completed

Temporary and permanent cathodic protection inside and outside crude oil storage tanks

Design, procurement, installation and commissioning of a cathodic protection system for the bottoms and interiors of two 94-metre-diameter crude oil storage tanks

Temporary and permanent cathodic protection inside and outside crude oil storage tanks
Engineering, Procurement, and Construction (EPC)
  1. Client Makran Petrorefining Company
  2. Location Hormozgan — Jask
  3. Year 2023
  4. Scopes Cathodic Protection
Field gallery