Procurement and Construction (PC)
Installation of a Densitometer and Monitoring System on the Headers of T and Azarpad Jetties
Procurement, installation and commissioning of 11 densitometers on the loading jetty pipelines to estimate the weight of crude oil loaded onto oil tankers and prevent the mixing of light and heavy crude oil.
- Client Petroleum Export Terminals Company
- Location Bushehr — Kharg Island
- Year 2008–2009
- Scopes Cathodic Protection
Field gallery
Nearby files
Keep exploring
-
2004–2005
Cathodic protection of jetties 14 and 15 and breakwater structures
Pars National Petrochemical Company
-
2015
Sealing Around Storage Tanks and Cathodic Protection of the Export Jetty, Gas Transmission Pipeline and Kaveh Methanol Plant
Kaveh Methanol Company
-
2007–2010
Conversion of the Cathodic Protection System at Azarpad Jetty from Temporary to Permanent and Implementation of a Remote Monitoring System
Petroleum Export Terminals Company
-
2023
Temporary and permanent cathodic protection inside and outside crude oil storage tanks
Makran Petrorefining Company